Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Feb 26, 2022     Throttle quadrant - (1.7 hours)       Category: Controls
This evening, I installed the throttle quadrant for what I hope will be the last time. It looks like all the time I spent adjusting the cable lengths and quadrant arm throws has now paid off. The holes in the arms look like they are going to be perfectly aligned with the clevis forks, with a good spacing from the forward throw limits on the quadrant. The next step will be to insert the clevis pins and their cotter pins (which will undoubtedly be a challenge).

I also connected one of the Molex connectors behind the quadrant.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.